Installation Procedure
BackCondensing Unit Checklist
Checklist for Installation and Commissioning of Refrigeration System
- Make sure that the commissioning done by approved installation companies
- Make sure that the CDU is placed in correct position and easy to repair
- Make sure that place the Equipment in smooth and solid surfaces
- Make sure that the ventilation space for fixing CDU as per given in the Guidelines
- Confirm the Unit is not direct contact with sunlight, heat sources and cold wind
- Confirm the Unit installed is not close to the sea shore area and dust free
- Check all motors, fans and pump bearings in the Equipment
- Make sure that the selection of piping as per standard
- Confirm the pipe is clean and dust free
- Confirm during starting brazing, always apply nitrogen gas to connecting pipes
- Confirm after brazing, the pipeline should not have leakage and dust particles
- Please confirm the suction line should be in proper insulation
- Confirm the wiring connection of unit as per given in the Installation manual
- Make sure that the vacuuming done as per given in the Installation manual
- Confirm Expansion valve, solenoid valve and other check valves should be open during vacuuming
- Confirm the refrigerant charged as per given in the guidelines
- Confirm Before starting the refrigeration system, perform all installation work on the Refrigerated display side before powering up the equipment
- Make sure that all the electrical enclosure’s switches on (located on the front face of the condensing unit)
- During starting, confirm compressor(s) and fan(s) start running
- Check the voltage and amperage readings at the compressor terminals
- Make sure that the compressor and condenser fan rotating in correct direction
- Make sure that no vibrations or abnormal noises are present. If vibrations or abnormal noises are noted, shut off the group and locate the cause
- Once the equipment’s operation has been stabilized, check the suction and discharge side pressure and temperature
- Check Superheat conditions as per our requirements
- Make sure that the unit is running, to fulfill the commissioning data
- Confirm the cutoff pressure setting in the suction and discharge side
- Make sure that crankcase heater is working properly
- Confirm the Oil level in the compressor is correct
- Make sure that the receiver valves are opened
- Confirm the Expansion valve is adjusted as per our requirements
- Please make sure that the pressure maintained in the refrigeration system is correct
- Check that the room thermostat is set for normal operation and adjust if required
Pre-Commissioning Checklist
- Secure commissioning gauges to the high side of the system, check for a positive charge
- Check tightness of electrical components and properly terminated
- Check external fuses/MCB are of correct rating
- Check units properly earthed
- Check pipe work is earth bonded
- Check that the remote on/off switch (if fitted) is in the off position
- Switch on the controls and individual circuits, primary and secondary, MCBs to the ON position. At this stage the control display panel should be illuminated
- Check the MCBs in the ON position measure the incoming voltage
- Check rotation of the Compressor
- Check voltage and frequency at permanent supply
- Measure and record the primary and secondary voltages at each of the transformers, adjust tapping if necessary and record on the commissioning document
- Check all timer settings are correct
- Check oil level
- Check fans rotate freely
- Check system correctly evacuated
- Check operating of HP/LP cut-out
- Record Controller Data
Commissioning Checklist
- Measure and record the compressor Amps
- Measure and record full speed of Apms of each condenser and evaporator Fans
- Check the liquid line sight glass is clear and dry
- Check the superheat setting adjusts the expansion value to maintain a superheat setting of approximately 5 to 8K at all operating loads
- Check and record the following:
- Suction and discharge pressure
- Liquid, discharge and suction line temperatures