BackControl Panel - Installation Checklist
- Check visually inspect the terminal
- Check that all items are included in accordance with the delivery documen
- Check for transport damages
- Check no objects or free parts could be inside the panel
- Check the door is correctly closed and locked
- check Storage room must have an adequate temperature and low humidity value (If you want to store)
- Check the contact between the electrical panel and aggressive contaminating substances that could prejudice functionality and electrical security
- Check the panel power supply must be on a dedicated line, and must be placed a device suitable for protection against indirect contacts
- Ensure that do not fit power supply wiring and signal wiring (probes/sensors and digital inputs) in the same race ways or ducts
- Ensure that do not use multi-polar cables in which there are wires connected to inductive/power loads or signaling wires (e.g. probes/sensors and digital inputs)
- Check to minimize the length of connect or wires so that wiring does not twist into a spiral shape as this could have negative effects on the electronics
- Make sure that when it is necessary to make a probe/sensor extension, the wires must have a cross-section of at least 1mm2
- Check the control panel fixed properly
- Check the cold room temperature displaying correctly
- Check the unit control activation/deactivation
- Check the unit alarm working properly
- Ensure the LED indicators and large display, illustrate system status
- Ensure that defrost operation condition
- Make sure that cold room light ON/OFF correctly
- Check the insulation of connecting wires
- Ensure that during maintenance, electrical panel must be without power
- Ensure that authorized staff only do the maintenance work
- Check the tools must be correctly cleaned and greased during maintenance
- Check clearance of MCB's & MCCB’s
- Check for any over loading
- Check voltage at lamp
- Make sure that all wiring is properly connected and routed away from heat sources, electromagnetic devices, and moving components
- Check proper relay operation
- Check the permanent labels affixed
- Ensure that units/equipment accessible for maintenance/replacement
- Check the fuses installed and labeling of wire done correctly
- Make sure that all electrical connections are tight
- Verify the proper grounding installed for components and unit
- Check the unit placed in safe and operatable
- Check the power supply flow into the circuit as per standard